Settle the layout first
Confirm where fixtures and equipment go, where the water and sewer come in, where floors and ceilings are open, and the finished floor heights before any pipe goes in. A late change can affect drain slope, vents, access and the other trades.
Rough-in means working around everyone else
Drains and vents have to fit around framing, ductwork, wiring, cabinets and waterproofing. Agree up front who sorts out clashes and who signs off on changes made on site.
- A list of fixtures and equipment
- Drain and vent routes, and where the cleanouts are
- Water lines and shut-off valves
- Who handles holes, sleeves, backing and fire-stopping
Inspect and take photos before closing up
Finish the required tests and inspections. Then photograph the hidden pipes, valves, cleanouts and connections, and write down any changes, so future repairs do not start with guesswork.